by
Mndfreeze
» 26 Jan 2018, 09:11
I only saw what looked like 2 tile high slopes in that video? Clay was changed a long time back to have the same falloff as soil. The best you can hope for is 2.0 difference per tile, which means if you go up 2 you have to go out 1 to get a total of 4.0. I could totally be wrong, but I've been trying to find advanced terraforming guides or info for about 2 weeks and come up short every time I look.
| WALL
XX 2.0
XXX 2.0
GROUND